Type:
Specification:
Solar panel laminating machine is a mechanical device that presses multiple layers of materials together.
Name |
2345 Double Chamber Fully Automatic Solar Panel Laminating Machine |
|||
Type |
Double Chamber 2345 |
|||
Main paramete |
Effective lamination area |
2300×4500×35-2 |
Dimension |
20.4m × 3.25m ×1.8m |
Power supply |
AC380V 50Hz 3phase |
Operating deck |
Touch+PLC |
|
rated power |
145KW |
Compress gas pressure |
0.6~0.8MPa |
|
Normal working rate |
≤65KW |
Compress gas flow |
≥800L/min |
|
Work vacuum Degree |
40~100Pa |
Work temperature range |
30℃~180℃ |
|
Ultimate vacuum |
40Pa |
Temperature unevenness |
≤±1.5℃ |
|
Height of laminating cavity |
35mm |
Temperature accuracy |
±1℃ |
|
aeration speed |
0-50L/s |
Evacuation time |
5~7min(Adjustable) |
|
Machine weight |
24T |
Work cycle |
≤9min |
|
Equipment lifetime |
≥10 YEARS |
utilization rate of equipment |
≥99% |
|
range of application |
Can laminate single crystal, polycrystalline, double glass solar modules |
|||
Other configuration parameter |
||||
parameter |
Upper cover length |
≥250mm |
Upper cover stroke |
150mm |
Temperature control mode |
Intelligent PID control |
Heating mode |
SD320heating oil |
|
Temperature control point |
(standard) 5 see drawing-1 |
Heating power |
54KW+54KW |
|
Rubber lifetime |
≥3000times |
Conveying speed |
4~13.5m/min |
|
Vacuum pump |
2X-70+ZJP600/2X-70 2X-70+ZJP600/2X-70 |
Transmission bearing load |
≤300Kg ≤300Kg |
Ooitech, One-stop Solution For Solar Panel Production Line.
Has The Following Required Machinery And Accessories
Ooitech “Turnkey Solution” Includes: Factory Construction, Facility Layout, Raw Materials BOM guidance, Production Procedure assitance, Solar Power Station installation technical support Etc.
Supply 10MW-250MW Solar Panel Production Line
Update the traditional PV line to newest MBB solar panel production line.
Solar Cell Tabber Stringer Machine
Automatic Solder Bussing Machine
High Speed Automatic Layup Station
Building 1, Zixin Industrial Park, Yangguang Ave,Jiangxia Economic Development Zone, Wuhan of China
Mon-Fri: 8.30AM-5.30PM (UTC+8)